The project is a dam and hydroelectric power plant on the Pelotas River near Celso Ramos on the border of Santa Catarina and Rio Grande do Sul, Brazil. The power station has a 708 MW capacity and is the second tallest dam in Brazil.
Interested in this project and want to get involved?
Project Type:
Carbon
Capability:
Hydropower
Emissions Reduction:
608,686 mt CO2e
Verification:
Verified Carbon Standard
PROJECT sustainability GOALS
The projects featured reflect our cumulative portfolio and include several projects that have since stopped producing certified credits, may be pending credit issuance, or are under development. More information about our process can be found here.
